Wind power grid connected operation condition
2014/10/14 16:00:03
Wind power grid connected operation condition of first half year of 2014
In the first half year of 2014, the national wind power new grid capacity is 6320000 kilowatts, the cumulative grid capacity is 82770000 kilowatts, the year on year growth is 23%. The wind power electric capacity is 7.2 billion kilowatt, 3.58 billion kilowatt decrease compared to the same period, the average utilization of wind power is 979 hour, 113 hour decrease compared with the same period, the national average abandon wind rate is 8.5%, , 5.14% year on year decline.
In the first year of 2014, the most newly added grid capacity is Xinjiang province(1.39 million kilowatt), Shanxi province(0.66 million kilowatt), Shandong(0.6 million kilowatt)
The province for top average utilization hour of wind power is Yunnan province(1681 hours), Tianjin(1332 hours) and Sichuan(1294 hours)
The province for lower utilization hour of wind power is Guizhou province(840 hours), Heilongjiang province(832 hours) and Jilin province(727 hours)